1、在java 7中,java.time包不存在,所以我们需要使用java.util.calendar和java.util.date类来实现类似的功能。
以下是一个基于java 7的示例代码:
import java.util.calendar;
import java.util.date;
public class datecalculator {
public static date calculatedate(date startdate, date enddate, int dayofweek) {
calendar startcal = calendar.getinstance();
startcal.settime(startdate);
calendar endcal = calendar.getinstance();
endcal.settime(enddate);
// 确保输入的dayofweek在正确的范围内(1-7,其中1代表周一,7代表周日)
if (dayofweek < 1 || dayofweek > 7) {
throw new illegalargumentexception("invalid dayofweek value. must be between 1 and 7.");
}
// 将输入的dayofweek转换为calendar的周几(calendar.monday, calendar.sunday等)
int targetday = dayofweek + 1; // 因为calendar的周日是1,周一到周六依次递增
// 查找开始日期之后的第一个目标周几的日期
while (startcal.gettime().before(enddate)) {
if (startcal.get(calendar.day_of_week) == targetday) {
break;
}
startcal.add(calendar.day_of_month, 1);
}
return startcal.gettime();
}
public static void main(string[] args) throws exception {
long startdatetimestamp = 1377753600000l; // 开始日期的unix时间戳,例如2013-09-01 00:00:00
long enddatetimestamp = 1380345600000l; // 结束日期的unix时间戳,例如2013-10-01 00:00:00
int targetdayofweek = 3; // 周三(在java中,1=monday, 7=sunday)
date startdate = new date(startdatetimestamp);
date enddate = new date(enddatetimestamp);
date calculateddate = calculatedate(startdate, enddate, targetdayofweek);
if (calculateddate != null) {
system.out.println("the next occurrence of " + targetdayofweek + " (wednesday) between "
+ startdate + " and " + enddate + " is on: " + calculateddate);
} else {
system.out.println("there is no occurrence of the specified weekday between the given dates.");
}
}
}这段代码首先将开始日期和结束日期转换为calendar对象,然后使用循环寻找开始日期之后的第一个指定周几的日期。如果找到,就返回这个日期;否则,返回null。在main方法中,我们使用unix时间戳创建了开始和结束日期,并调用了calculatedate函数。
2、在java 8中,根据开始时间、结束时间和周几来计算日期,可以使用java.time包下的类,如localdate、dayofweek等。
以下是一个示例代码,展示了如何实现这一功能:
import java.time.dayofweek;
import java.time.localdate;
import java.time.temporal.temporaladjusters;
public class datecalculator {
public static localdate calculatedate(localdate startdate, localdate enddate, int dayofweek) {
// 确保输入的dayofweek在正确的范围内(1-7,其中1代表周一,7代表周日)
if (dayofweek < 1 || dayofweek > 7) {
throw new illegalargumentexception("invalid dayofweek value. must be between 1 and 7.");
}
// 将输入的dayofweek转换为dayofweek枚举值
dayofweek targetday = dayofweek.of(dayofweek);
// 查找开始日期之后的第一个目标周几的日期
localdate firstoccurrence = startdate.with(temporaladjusters.nextorsame(targetday));
// 如果第一个出现的日期在结束日期之后,则返回null,表示在指定区间内没有找到符合条件的日期
if (firstoccurrence.isafter(enddate)) {
return null;
}
return firstoccurrence;
}
public static void main(string[] args) {
localdate startdate = localdate.of(2023, 9, 1); // 开始日期
localdate enddate = localdate.of(2023, 9, 30); // 结束日期
int targetdayofweek = 3; // 周三(在java中,1=monday, 7=sunday)
localdate calculateddate = calculatedate(startdate, enddate, targetdayofweek);
if (calculateddate != null) {
system.out.println("the next occurrence of " + targetdayofweek + " (wednesday) between "
+ startdate + " and " + enddate + " is on: " + calculateddate);
} else {
system.out.println("there is no occurrence of the specified weekday between the given dates.");
}
}
}这段代码首先定义了一个calculatedate方法,它接收开始日期、结束日期以及表示周几的整数作为参数。然后,使用temporaladjusters.nextorsame方法找到开始日期之后的第一个指定周几的日期。如果这个日期在结束日期之后,则返回null。最后,在main方法中调用此函数,并打印结果。
请注意,java的dayofweek枚举中,1代表星期一,2代表星期二,依此类推,直到7代表星期日。因此,如果要查找周日的日期,应传入7。
到此这篇关于java根据开始时间和结束时间以及周几计算出日期的文章就介绍到这了,更多相关java根据周几计算出日期内容请搜索代码网以前的文章或继续浏览下面的相关文章希望大家以后多多支持代码网!
发表评论